Reference projects
City of Hamburg, Spange Horn
Civil Engineering Works for District Heating
- 2,200 m construction of pipe trenches for district heating line
- construction of a steel bridge
- working in contaminated areas
- groundwater treatment
- 65 m pipe jacking C 1400 mm
- construction of a chamber by in-situ concrete
- connection of the chamber to an existing bridge
Order details
Customer:
Vattenfall Europe Wärme AG
Period of implementation:
08/2010-
09/2011
Order volume:
6.68 m euro net