Reference projects

City of Hamburg, District Heating Tivoli

Construction of a district heating system

  • 560 m construction of plastic-coated twin-pipes diameter 200 mm
  • construction of pipe trench shoring out of wooden planks 1,800 m²
    and horizontal timber sheeting 300 m²
  • construction of foot bridges and road bridges
  • removal and new installation of road drainage
  • pick up and rebuilding of all surfaces:
    kerbs, flagstones, concrete paving, asphalt, base courses
  • Road construction:
    Bk 3.2 approximately 80 m²
    Bk 100 approximately 465 m²

Length: 560 m

Depth: 1.60 m

Order details

Customer:
HanseWerk Natur GmbH

Period of implementation:
10/2016- 07/2017

Order volume:
770.2 k euro net