Reference projects

Community of Großenaspe, Meiereigraben

Pipe Jacking reinforced concrete 1200 mm

  • 25 m manned pipe jacking with controllable open head of a 1200 mm RC pipe under a railway embankment
  • construction of the start- and target pit by horizontal timber sheeting
  • construction of a brick manhole 1500 mm
  • groundwater lowering

Lenght: 25 m

Depth: 2.00 m - 6.00 m

Order details

Customer:
AKN Eisenbahn AG

Period of implementation:
10/2016- 01/2017

Order volume:
266 k euro net