City of Hamburg, Stockmeyerstrasse
Reconstruction of sewer
- 2 x 50 m laying of pressure pipes PE 200 mm under a railway bridge
- 33 m pipe jacking of a stoneware pipe 250 mm
Particular challenges:
- the work was only possible at high tide
- the middle of the canal had to be cleared for shipping
- strong flow, the pontoon had to be well anchored
Length: 133 m
Depth: 2.0 m - 5.0 m
Order details
Customer:
Hamburger Stadtentwässerung
Period of implementation:
08/2011-
09/2011
Order volume:
185 k euro net