Reference projects

City of Hamburg, Stockmeyerstrasse

Reconstruction of sewer

  • 2 x 50 m laying of pressure pipes PE 200 mm under a railway bridge
  • 33 m pipe jacking of a stoneware pipe 250 mm

Particular challenges:

  • the work was only possible at high tide
  • the middle of the canal had to be cleared for shipping
  • strong flow, the pontoon had to be well anchored

Length: 133 m

Depth: 2.0 m - 5.0 m

Order details

Customer:
Hamburger Stadtentwässerung

Period of implementation:
08/2011- 09/2011

Order volume:
185 k euro net