Reference projects
City of Aachen, Liebigstraße/Dammstraße
Sewer Rehabilitation
- 300 m rehabilitation of combined sewer 1000/1500 mm GRP
- 180 m rehabilitation of combined sewer 1200/1800 mm GRP
- construction of 5 tangential manholes
- construction of a brick overflow structure
- construction of 6 pits by horizontal timber sheeting and strongframe method
- connection of 52 inlets 100 mm up to 1000 mm by GRP hand laminates
- 240 m laying of ductile cast iron pipes 150 mm by pipe-in-pipe method
- mounting with stainless steel sleeves
- restoration of a brick horseshoe shape 2000/1200 mm
- construction of a 216 m overflow pipe 150 mm
- construction of a house connection in a chamber
- construction of a pit by horizontal timber sheeting 4.30 m x 9.90 m x 1.50 m
Length: 720 m
Order details
Customer:
STAWAG Stadtwerke Aachen AG
Period of implementation:
09/2015-
02/2016
Order volume:
1.02 m euro net