Reference projects

City of Aachen, Liebigstraße/Dammstraße

Sewer Rehabilitation

  • 300 m rehabilitation of combined sewer 1000/1500 mm GRP   
  • 180 m rehabilitation of combined sewer 1200/1800 mm GRP
  • construction of 5 tangential manholes
  • construction of a brick overflow structure
  • construction of 6 pits by horizontal timber sheeting and strongframe method
  • connection of 52 inlets 100 mm up to 1000 mm by GRP hand laminates
  • 240 m laying of ductile cast iron pipes 150 mm by pipe-in-pipe method
  • mounting with stainless steel sleeves
  • restoration of a brick horseshoe shape 2000/1200 mm
  • construction of a 216 m overflow pipe 150 mm
  • construction of a house connection in a chamber
  • construction of a pit by horizontal timber sheeting 4.30 m x 9.90 m x 1.50 m

Length: 720 m

Order details

Customer:
STAWAG Stadtwerke Aachen AG

Period of implementation:
09/2015- 02/2016

Order volume:
1.02 m euro net