Neumünster, B-Plan 177 "Rendsburger Strasse"
Diversion of flow
- groundwater lowering:
20 m circumferential collector pipe, induction of filters, 80 m outlet pipe, vaccum pump - construction of 2 deep wells by drilling in a depth of 12 m and submersible pumps with a capcity of 50 - 90 m³/h
- placement of a pump shaft
- open dewatering
Depth: up to 12 m
Order details
Customer:
Granit Tiefbau GmbH
Period of implementation:
11/2014-
12/2014
Order volume:
28.5 k euro net