Hamburg, Framework contract for district heating

Civil engineering work 

  • 4.930 m² of shoring to create the pipe trenches
  • Types of shoring: sheet pile shoring, corner lug shoring, embanked construction method with and without dewatering
  • Civil engineering work to create excavation pits and pipe trenches for the renovation and laying of new plastic casing pipes
  • Construction of pedestrian and roadway bridges
  • Demolition and restoration of district heating ducts, shafts and transition structures
  • Removal of all surfaces: Kerbs, paving slabs, concrete paving, large paving, asphalt, base courses

Execution details

Client
Vattenfall Wärme Hamburg GmbH
Execution period
07/2014 – 12/2015
Execution volume
1.07 million euros net