Neumünster, Holsatenring

District Heating Ring, 5. BA

  • 1,300 m construction of pipe trenches for a district heating line
    diameter 400 mm out of plastic coated pipes
  • groundwater lowering

Execution details

Client
SWN Stadtwerke Neumünster GmbH
Execution period
04/2011 – 12/2011
Execution volume
3.25 m Euro net