Neumünster, Kuhberg railroad crossing
Civil engineering work
- Laying 130 m of new district heating pipes KMR DN 450/500
- Construction of 70 m pipe trench with sealing piles B = 4.0 m
- Construction of 3 excavation pits: each L 20 x W 12 x D 6 m with sheet pile shoring
- Bored piles and soldier pile wall shoring
Execution details
- Client
- SWN Stadtwerke Neumünster
- Execution period
- 10/2022 – 12/2023
- Execution volume
- 1.634 million euros net