Bruchsal, Werner-von-Siemens-Strasse

Sewer renewal

  • 180 m renewal of GRP horseshoe sewer 3200/2000 mm
  • installation of liquid soil
  • construction of 2 elevated pipe bridges
  • 428 m diversion of flow by pumping: 40 l/s up to 600 l/s
  • 450 m² road construction and 750 m² pavement

Lenght: 180 m

Depth: 3.00 m

Execution details

Client
Stadt Bruchsal, Abwasserbetrieb
Execution period
03/2014 – 03/2015
Execution volume
1.60 m Euro net