Ellerhoop, DRL Barmstedt

Sewer Construction and Pipe Jacking

  • 500 m laying of PE pipes DN 450
  • 50 m laying of PP pipes DN 300
  • 280 m laying of PP pipes DN 400
  • 24 m pipe jacking DN 600 ST
  • 55 m pipe jacking DN 1200 ST
  • construction of pits by strongframe method, sheet piling method, shoring boxes and horizontal timber sheeting
  • open dewatering

Length: 909 m

Execution details

Client
azv Suedholstein
Execution period
10/2019 – 06/2021
Execution volume
2.50 m Euro net