Hamburg, Anckelmannsplatz
Construction of a water supply line
- 8 m DN 200 St C PE
- 17 m DN 300 St C PE
- 6 m DN 600 St C PE
- 325 m DN 800 St C PE
- installing ob 150 m St C PE DN 800 in existing steel pipes DN 1100 + DN 1300
- 1,000 m² horizontal timber sheeting and strongframe method
- installation of 4 shut-off valves, 4 slides and 2 underground hydrants
- gattering and rebuilding of 1,25 m² asphalt and 900 m² concrete flagstones
Length: 356 m
Execution details
- Client
- Hamburger Wasserwerke GmbH
- Execution period
- 08/2019 – 07/2020
- Execution volume
- 2.32 m Euro net