Hamburg, Lämmersieth
New construction of the Osterbek main stem
- 1.127 m new construction of a DN 1600 combined sewer in polymer concrete
- Construction of 13 manholes, 2 of them in masonry, 3 as polymer manholes and 8 as polymer tangential manholes
- Construction of a combined sewer overflow structure with corrosion protection
- Enclosure of house/trunk connection pipes
- approx. 800 m open and approx. 400 m closed dewatering with small vacuum filters
- Pre-flooding with DN 800 siphon system with a capacity of approx. 500 l/s
- Construction of a 3.0 m wide open pipe trench with soldier pile wall shoring
- Road construction
- Traffic safety
Length: 1,127 m
Depth: 9.0 m
Execution details
- Client
- Hamburg Municipal Drainage AöR
- Execution period
- 07/2014 – 06/2016
- Execution volume
- 7.30 mio euros net