Hamburg, Lämmersieth

New construction of the Osterbek main stem

  • 1.127 m new construction of a DN 1600 combined sewer in polymer concrete
  • Construction of 13 manholes, 2 of them in masonry, 3 as polymer manholes and 8 as polymer tangential manholes
  • Construction of a combined sewer overflow structure with corrosion protection
  • Enclosure of house/trunk connection pipes
  • approx. 800 m open and approx. 400 m closed dewatering with small vacuum filters
  • Pre-flooding with DN 800 siphon system with a capacity of approx. 500 l/s
  • Construction of a 3.0 m wide open pipe trench with soldier pile wall shoring
  • Road construction
  • Traffic safety

Length: 1,127 m

Depth: 9.0 m

Execution details

Client
Hamburg Municipal Drainage AöR
Execution period
07/2014 – 06/2016
Execution volume
7.30 mio euros net