Hamburg, Stockmeyerstrasse

Reconstruction of sewer

  • 2 x 50 m laying of pressure pipes DN 200 PE  mm under a railway bridge
  • 33 m pipe jacking of a stoneware pipe DN 250

Particular challenges:

  • the work was only possible at high tide
  • the middle of the canal had to be cleared for shipping
  • strong flow, the pontoon had to be well anchored

Length: 133 m

Depth: 2.0 m - 5.0 m

Execution details

Client
Hamburger Stadtentwässerung
Execution period
08/2011 – 09/2011
Execution volume
185 k Euro net