Hamburg, Australiastraße

Diversion of flow

  • Diversion of flow
  • Maximum 300 l/s
  • Flanged steel pipe DN 300
  • Length: 460 m
  • Construction of a pipe bridge

     Height: 4.50 m

Execution details

Client
Hamburg Port Authority AöR
Execution period
01/2020 – 02/2021
Execution volume
546.9 k Euro net