Hamburg, Bei der Grünen Brücke
Diversion of flow
- diversion of flow, capacity 150 l/s - 300 l/s
- construction of a pipe bridge, elevated on a length of 60 m
- construction of a pipe bridge, elevated on a length of 30 m
Execution details
- Client
- Hamburger Stadtentwässerung AöR
- Execution period
- 03/2021 – 05/2021
- Execution volume
- 156,9 k Euro net