Aachen, Liebigstrasse/Dammstrasse
Sewer Rehabilitation
- 300 m rehabilitation of combined sewer DN 1000/1500 GRP
- 180 m rehabilitation of combined sewer DN 1200/1800 GRP
- construction of 5 tangential manholes
- construction of a brick overflow structure
- construction of 6 pits by horizontal timber sheeting and strongframe method
- connection of 52 inlets 100 mm up to 1000 mm by GRP hand laminates
- 240 m laying of ductile cast iron pipes DN 150 by pipe-in-pipe method
- mounting with stainless steel sleeves
- restoration of a brick horseshoe shape DN 2000/1200
- construction of a 216 m overflow pipe DN 150
- construction of a house connection in a chamber
- construction of a pit by horizontal timber sheeting 4.30 m x 9.90 m x 1.50 m
Length: 720 m
Execution details
- Client
- City of Aachen, Liebigstrasse/Dammstrasse
- Execution period
- 09/2015 – 02/2016
- Execution volume
- 1.02 m Euro net