Aachen, Liebigstrasse/Dammstrasse

Sewer Rehabilitation

  • 300 m rehabilitation of combined sewer DN 1000/1500 GRP   
  • 180 m rehabilitation of combined sewer DN 1200/1800 GRP
  • construction of 5 tangential manholes
  • construction of a brick overflow structure
  • construction of 6 pits by horizontal timber sheeting and strongframe method
  • connection of 52 inlets 100 mm up to 1000 mm by GRP hand laminates
  • 240 m laying of ductile cast iron pipes DN 150 by pipe-in-pipe method
  • mounting with stainless steel sleeves
  • restoration of a brick horseshoe shape DN 2000/1200
  • construction of a 216 m overflow pipe DN 150
  • construction of a house connection in a chamber
  • construction of a pit by horizontal timber sheeting 4.30 m x 9.90 m x 1.50 m

Length: 720 m

Execution details

Client
City of Aachen, Liebigstrasse/Dammstrasse
Execution period
09/2015 – 02/2016
Execution volume
1.02 m Euro net